A Rochdale funeral director has had plans to replace its funeral home with modern apartments refused.

Cope Funeral Services Ltd applied to Rochdale Council to demolish the existing funeral home and detached garages in Manchester Road and create 28 self-contained apartments within three blocks over 3/4 floors.

The plans also include landscaping and on-site parking, cycle storage and bin storage, a new vehicular entrance from Castle Avenue, as well as closing the vehicle entrance from Manchester Road and replacing it with pedestrian access.

While the council’s planners support the principle of redeveloping the site, they say they cannot approve the scale and design of the proposed blocks.

A planning officer’s report stated: “The proposal has been amended following concerns raised by officers on October 9, 2025, in regard to the massing, design, appearance, level of landscaping and impact on neighbouring properties along with various concerns / matters that were outstanding following consultee responses.

“The original scheme was for one three-storey block comprising 28 units (12 x 1 bedroom and 16 x 2 bedroom). The central atrium comprised a concierge entrance on the ground floor, staff facilities on the first floor and a gym on the second floor.

“The amended scheme seeks permission for the erection of three blocks. Two blocks comprise a four-storey building and the third a three-storey building. The development comprises 28 residential apartments consisting of 2 x 1 bedroom and 6 x 2 bedroom flats in each 4 storey building and 12 x 1 bedroom flats in the three-storey building. The application form states all the flats are to be provided as open market housing.

“The agent was advised on the basis of the initial submission that the proposed development could not be supported due to significant concerns with the massing, design and appearance of the scheme, along with concerns with the level of landscaping and impact on neighbouring properties.

“There were also outstanding issues raised by consultees. Given the extent of revisions considered necessary, officers recommended a pre-application process to work through the varied concerns.

“Despite the above, revised plans were submitted, making substantial amendments including a change in the number of buildings, the number of storeys proposed, and the quantum of apartments. Nevertheless, following a further review the agent was advised that there remained significant concerns with the proposals, including new issues arising due to the revised design. Several issues raised by consultees also remained outstanding.”

READ MORE: Decision on changes to Touchstones renovation plans

The council suggested other approaches it deemed in keeping with the area, including a two-storey terrace style building, mews housing, maisonettes, or well-proportioned apartments.

In a supporting statement, Summit Planning Associates submitted: “The application proposal brings forward the opportunity to realise the redevelopment of a previously developed, under-used site in a very accessible, urban location. This also represents a very effective and efficient use of the land in question.

“Overall, the proposed development can be accommodated at the site, relative to the extent of the existing building and have appropriate regard to the context of the surrounding area, the protection of amenity and the need to provide a good standard of living for future occupiers of the site, relative to the existing neighbouring land uses and occupiers.

“It is considered that the proposed development demonstrates a proposal of good, high-quality design.”

In refusing the application, the council stated: “Whilst the principle of residential redevelopment of the site is supported, the proposal fails to comply with a significant number of local and national policies. Substantial revisions and additional technical information would be required to achieve an acceptable scheme.

“By reason of its excessive scale, height and massing, the proposed development would be overly-dominant in the street scene and unsympathetic in appearance. In addition, the architectural detailing and fenestration, combined with the proposed materials compound the poor design which fails to respect the character of the surrounding area.

“The proposed development fails to provide an acceptable standard of living for future residents due to non-compliance with the Nationally Described Space Standards, lack of privacy to ground-floor flats without defensible space and the creation of unsecure secluded areas.

“Furthermore, the application fails to achieve the energy and carbon targets set out in PfE policy, nor has sufficient information been provided as to compliance with accessibility standards. Combined, these factors are to the detriment of the living standards of future residents.

“The application has failed to provide sufficient information regarding ecology and trees, including the habitats present onsite, species lists within habitats, priority species, and suitable 2:1 tree replacement.

“The application has failed to provide sufficient information in respect of a comprehensive drainage strategy.”

SUPPORT THE ROCHDALE TIMES: FOLLOW US ON FACEBOOK